Rogz Control Shock Absorbing Bungee Dog Long Lead - 5 Colours

Rogz Control Shock Absorbing Bungee Dog Long Lead - 5 Colours

Price
$48.59
Earn 3x points and collect 144 Everyday Rewards points. Promotion ends 22/06/2024.
Create a MyDeal Account or Login to link your card
Colour
Shipping
Unable to calculate delivery for , please Contact Us Delivery unavailable to Change
 
24-48 hour dispatch
Quantity
Maximum item limit (4000) has been reached.
 
The Control Lead is designed for strong erratic pullers, absorbing the pull pressure along the surface of the soft bungee webbing which extends and retracts according to your dog's behaviour, minimizing the risk of injury to you or your dog.

Features

• Shock absorbing webbing
• ShocLoc control system
• Reflective stitching
• SnapLoc trigger hook
• Waste bag holder
• Durable nylon
• Soft neoprene handle

Sizes guide

(control lead length) width of webbing size

• M - (1.4m) 16mm
• XL - (0.8m) 25mm

Shipping Details

Pet Station ships items within 1-3 business days. Parcels are delivered usually between 3-7 business days after ordering depending on location. Pet Station tries to ensure that all products are delivered in a prompt and timely manner. However, from time to time, it is possible that shipping and other factors outside of our control may result in delays. Pet Station does not accept any liability for loss or damage suffered by anyone as a result of any such delays and we shall not be liable for any inaccuracy of information provided in relation to the date and time of delivery.

Pet Station reserves the right not to ship to remote or rural locations. If you are located in a remote or rural area & you place an order we will contact you to try work out a solution for you, we may be able to deliver your parcel to a town near you. If we are unable to find a solution you will be issued with a full refund.

Change of Mind:

Pet Station will accept any new and unused purchase returned within 30-days of purchase for a refund or exchange (excluding freight charges) Any goods returned for a refund or exchange must be in the original packaging and in a saleable condition, accompanied by the original invoice number, date of purchase and reason for return.

Please contact us in the event that you're not satisfied with your purchase or service we have provided as we're more than happy to work with you to ensure a positive experience.

All returns are subject to inspection by Pet Station and must be returned to the address shown on the invoice at the consumer’s expense for inspection. Any part that, in our opinion, shows evidence of being used or installed contrary to manufacturer's instructions and/or subjected to improper handling, packaging, or shipping by the customer will not be eligible for exchange, refund, or warranty consideration.

No liability will be attached to Pet Station for any loss of profits and/or any other loss, damage or expense arising out of any defect from supplied componentry.

Warranty:

If you received a damaged shipment, product and/or faulty item, please send through photos of the damaged item(s) and include your invoice number and name, and we will work with you to resolve the issue.

Refund Guarantee Icon
Shop with peace of mind
All marketplace products are covered by our MyDeal Refund Guarantee Learn More

Estimated Delivery Time Frame: 3 - 10 Business Days

Have a question about this product? Click here
Secure ways to pay at checkout
Buy Now, Pay Later
From $10/week with
Zip
4 interest-free instalments of $12.15 (excluding shipping) by AfterPay
Pay in 4 interest-free payments of $12.15 with PayPal
Sold & shipped by Pet Station
cashback icon
bronze Seller
A seller's rating is an overall score calculated from performance metrics. Learn More
87.35%
Proudly growing a MyDeal Forest
Proudly growing a MyDeal Forest
By purchasing from MyDeal, you’re helping us plant 7.8 hectares of trees per year with Greenfleet. Learn More

More from this brand

Reference ID: 4100875

Reviews (0) Add Review

No reviews yet